Wednesday, July 25, 2018

Into The Light of Day...

Finally the boat is ready to move out of the shop. The building jig was raised enough to slide a furniture moving dolly under each corner to move the boat out to the large door of the shop. A chain fall was rigged at the door to lift the bow and a hydraulic hoist was positioned at the stern.

 
















My friend Russ McComb was a great help 

The boat was lifted enough to remove the building jig.



The trailer was rolled under the boat and the boat was lowered onto the trailer.



Cockpit and deck will be painted with International Perfection Med white. Here is coat one
of three in the cockpit rolled on and tipped with a brush by Eric Jolley. Bluish tinge is from tarp above.
This is the keel trunk deck plate with 3 coats of Perfection
and Kiwi Grip no skid