| The boat was first lifted so that the building jig could be pulled out |
![]() |
| Many hands were necessary to stow the building jig out of the way. |
![]() |
| Bow lifting point |
![]() |
| Safety lines were rigged to catch the boat in case of failure of the lifting points |
![]() |
| The moment of truth as the hull just clears the supporting beam |
![]() |
| Home free |
| This plug goes in the motor well when under sail |
| Two layers of 80mm wide glass taping are added to the chines in preparation for fairing |
| bottom view of motor well plug in place |