The port #1 strake is in position on top of the trunk flange. The starboard strake will be lifted slightly and placed in position next to the port strake. The tie wires hold the strakes tightly together and screws next to the tie wires hold the assembly down to the building jig. The strakes are glued together between the tie wires/screws with a thin bead of epoxy. The tie wires and screws are removed after this glue cures and the remainder of the seam can be glued.
Pressure is being applied with sticks wedged from the ring on the trunk to strips of plywood on top of the strakes to get good glue squeeze out.
No comments:
Post a Comment