Dean's Shilshole 27
Sunday, February 3, 2013
#4 Hull Strakes...
›
#4 hull strakes on the table ready to sand. Fitting stringers forward. Many hands make hanging the strakes on the hull g...
Wet Locker Bottoms
›
There are two wet lockers immediately forward of the transom. The port side locker is for propane and the starboard side is storage fo...
Cockpit Sole...
›
In preparation for the cockpit sole, cross supports are glued in place and all contact areas are sanded. Void area under cockpit sole wa...
Wednesday, October 31, 2012
Forward bunk flat...
›
The holding and water tanks are fitted before both sides of the forward bunk flat are glued. The black flexible fresh water tank holds 15 g...
1 comment:
Saturday, June 23, 2012
New Parts...
›
Several months ago I ordered my lead keel bulb through Jim Betts in Anacortes. He is building 2 Bieker boats which needed keel bulbs and h...
Saturday, May 5, 2012
Mast Support & Ring Frames 3...
›
Paul Bieker supplied me with a tapered carbon fiber tube for the mast support. It began life as a bow spirit for an International 14. I u...
Monday, April 2, 2012
Ring Frames 2...
›
The first ring frame is assembled and is ready to be installed. Here it is aligned with the laser. The first ring frame is glued...
‹
›
Home
View web version