Counter top/shelf assemblies are now installed on both sides of the cabin as well as the diagonal ring frames.
|
Here is the underside of the starboard shelf assembly. The fillets are reinforced with 2 layers of 200g glass cloth. |
The next phase will be the cabin sides which have doublers in way of the windows.
|
Starboard side doubler |
|
Starboard side doubler with a part of the full- length strake being fitted.
|
|
Dry fit of port side strake viewed from the bow |
|
Strakes back on the table with puzzle joint glued and 300 g glass on outside. |
|
Joe is helping prepare the inside of the strakes for the 200g glass skin. |